100% Meter Installation and Utility Billing System Upgrade. We successfully installed over 1,200 new water meters across the Village of Burnham and transitioned the billing system from a quarterly to a monthly cycle, improving billing accuracy and financial stability for the municipality.
Utility Billing System Overhaul and SCADA System Upgrade. We modernized the City of Harvey’s utility billing system and upgraded its SCADA system, improving operational efficiency and enabling real-time monitoring of the city’s water infrastructure. Our team also conducted the city’s first-ever water rate increase analysis.
Water Line Leak Repair and Infrastructure Interconnect. When the Village of Robbins faced a critical water transmission line leak, The Lewis Group managed the emergency repairs while coordinating with the EPA to ensure water quality standards were met. Our work ensured the continuous delivery of safe water to residents.